A barge carrying 1,200 tonnes of steel structures came into Cai Mep in force 5 wind with 1.2 m seas.
Two 3,400 HP tugs assisted the berthing. The tidal window with enough draft was only 90 minutes, so the whole lift plan was locked two days ahead with nothing left to decide on site.
The barge was alongside at 04:40 and fully discharged in 6 hours.
